The steam will be shut down in Waldo Hall November 7, 2019 9:00 am – 12:00 pm to replace steam valves & traps. This will affect all heating in the building, including radiators. Crews are waiting until 9am to begin work so that the building temperature should already be warm enough for occupants.  

For questions or comments on this closure, contact Les Walton at 541-737-8812.

The industrial cold water will be shut down in Dryden Hall November 8, 2019 from 12:00 pm to 2:00 pm while backflow prevention assembly servicing & testing is performed. This will affect the industrial cold water in labs and equipment attached to the industrial cold water.

For questions or comments on this notice contact, Facilities Services  at 541-737-2969.

As part of the Pharmacy Chiller project, the air handler unit 1 will be shut down so that the inner duct liner of the air intake can be replaced. Shutdowns will occur from 3:00 pm to 12:00 am on Nov. 6 and again on Nov. 7. This will affect all floors on the north end of the Pharmacy Building.

For questions or comments on this closure, contact Project Manager John Doty at 541-740-8302.

As part of the Magruder Expansion project, water and medical gas will be tied in to the LINAC building on the north end of Magruder Hall. There will be a domestic water shutdown to the Large Animal wing and a medical gas shutdown to the entire building at Magruder Hall. Water for the rest of the hospital will not be turned off.

For questions or comments on this closure, contact Construction Manager Dave Raleigh at 541-230-0804.

Metered parking spaces along 30th Street near West Hall

Metered parking spaces near West Hall will be temporarily closed and/or blocked to allow equipment to park near the manhole adjacent to the corner of 30th Street and Intramural Lane. Workers will be clearing the storm sewer pipe. This will allow work to take place without blocking traffic. Some traffic slowing is expected for the safety of workers. Parking spaces will reopen as soon as work is completed.

For questions or comments on this closure, contact Infrastructure Project Manager Aaron Collett at (541) 207-2780.

Traffic will be controlled with flaggers between SW 15th and SW 26th Streets along Washington Way in order to allow exploratory utility work for the design of the Washington Way Reconstruction project. Roads will remain open but some delays should be expected.

For questions or comments on this closure, contact Construction Manager Lindsey Austin at (541) 990-7720.

In support of the Pharmacy chiller replacement project the building air handler unit will be shut down to treat and seal a drip pan. The shutdown will occur Sunday, October 20th from 7am to 7am on Monday October 21st.  The shutdown will affect air flow and heat throughout the building. 

For questions or comments on this closure contact Sean Olsen  at 541-737-2969. If there are lab-specific concerns about exhaust airflow contact EH&S at 541-737-2273.

Notice: Exhaust Fan Shutdown Ag. Life & Sciences Building

Effective Date(s): October 10, 2019 7:00 am – 4:00 pm

Due to emergency repairs one of the exhaust fans for the Agricultural & Life Sciences Building will be shutdown tomorrow, October 10, from 7am to 4pm.  The other two exhaust fans will remain operational.  This will affect building pressurization and airflow building wide.  Fume hoods will still be operational but sashes should be left closed when not in use.

For questions or comments on this closure contact Richard Olsen at 541-737-7025. If there are lab-specific concerns about exhaust airflow contact EH&S at 541-737-2273.