As part of the Kerr Admin Basement TI project, the fire sprinkler system will be shut down so contractors can work on the sprinklers in the Kerr Admin B008 suite. Additional time is needed to perform and complete the work that began on 10/4/2019.

For questions or comments on this closure, contact Construction Manager, Amy Keene at (541) 214-1038 or Project Manager, Christina Vinson at (503) 420-1031.

Scheduled: Campus Wide Generator Testing

Effective Date(s): September 2019

Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators.  Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing.  Each generator will be refueled after testing.

Week of September 2nd

  • Burt Hall
  • Dearborn Hall
  • Milne Computer Center
  • The Valley Library

Saturday September 7th

  • Kerr Administration Building
  • Kerr Administration Building Telecomm

Week of September 9th

  • Pharmacy
  • Sinnhuber Aquatic Research Lab
  • John L. Fryer Aquatic Animal Health Laboratory Salmon Disease Lab #1
  • Research Way Building

Week of September 16th

  • Portable #3
  • Portable #4

For questions or comments on this notice contact, Facilities Services at 541-737-2969.

Facilities Services will be performing annual load bank testing for the below listed building emergency/ stand-by generators.  Each test will take approximately 3 hours. There may be excessive noise and possible exhaust fume odors associated with testing.  Each generator will be refueled after testing.

May 18th

  • Kerr Administration Building Telecommunications
  • Kerr Administration Building

For questions or comments on this notice contact, Facilities Services at 541-737-2969.