As part of the Kerr Admin Basement TI project, the fire sprinkler system will be shut down so contractors can work on the sprinklers in the Kerr Admin B008 suite. Additional time is needed to perform and complete the work that began on 10/4/2019.

For questions or comments on this closure, contact Construction Manager, Amy Keene at (541) 214-1038 or Project Manager, Christina Vinson at (503) 420-1031.

As part of the Alumni Center HVAC Replacement project, the contractor is replacing air conditioning units on top of the facility. The parking lot to the east of the building will be closed (map). The crane work is anticipated to be completed by 2:00pm.

For questions or comments on this closure, contact Project Manager Christina Vinson at (503) 420-1031.

As part of the Washington Way Reconstruction project, the contractor will be potholing utilities along the road corridor in preparation for design/construction. They will have flaggers as needed. Potholes in the roadway may cause minor delays controlled by flagging.

For questions or comments on this closure, contact Project Manager Aaron Collett at (541) 207-2780.

As part of the Pharmacy 509 Chiller project, shut down of Pharmacy Air-Handler #1 for duct repair and insulation. This work is rescheduled from last week due to contractor emergency work that occurred during our scheduled duct cleaning.

For questions or comments on this closure, contact Project Manager John Doty at (541) 740-8302.

As part of the 2019 Path of Travel project, all metered parking spaces and the sidewalk at Dixon Recreation Center will be closed. The sidewalk between the Dixon entry plaza and the Pacific Power substation will be replaced and widened to better accommodate the pedestrian path of travel.  

For questions or comments on this closure, contact Construction Manager Lindsey Austin at (541) 990-7720.

As part of the Pharmacy 509 Chiller project, we need to clean the dust build-up with the duct in air handler #1 to help increase the airflow across the new cooling coils for the new chiller.  The air handler will be turned off at 5:30pm on Tuesday evening and will be shutdown until the cleaning is complete.  We need to leave off so that the dust/debris does not move down stream in the ducts.  It would be best to leave some of the doors in the labs open to help out with the exhaust floor and room pressurization.

For questions or comments on this closure, contact Project Manager John Doty at (541) 740-8302.

Concrete and Pump trucks will be parked outside the east entry of Dixon Recreation Center. The east side entrance will remain open during concrete pour however, staff members will reroute east entrance traffic through the maintenance hallway to the locker rooms.

For questions or comments on this closure, contact Construction Manager Dave Raleigh at (541) 230-0804.