Oregon State University
  • Blogs @Oregon State University

OSU Campus Closures, Shutdowns and Detours

Listing of campus closures, shutdowns and detours

Skip to primary content
Skip to secondary content
  • Getting Around Campus

Daily Archives:

6/26 – 8/10/19: Radiation Center Parking Lot (#3331) Space Closure

Posted on by mcfaddke

Due to the Radiation Center APEX demo, ten parking spaces are closed for staging of recycle dumpsters.

For questions or comments on this closure, contact Construction Manager Dave Raleigh at (541) 230-0804.

Posted in Parking Lot Impact, Parking Space Closure.

6/27 – 9/6/19: Softball Entrance/ADA Parking Closure

Posted on by mcfaddke

Due to the turf replacement at the Softball Stadium, the main entrance and associated ADA Parking Spaces will be closed.

For questions or comments on this closure, contact Construction Manager Rick Freeman at (541) 231-5368.

Posted in Parking Lot Impact, Parking Space Closure.

6/27 – 7/8/19: Park Terrace East Lot (#3233) Closure All Day

Posted on by mcfaddke

The Park Terrace East parking lot (#3233) between Park Terrace Avenue and Memorial Place will be closed. Work on the parking lot includes removal and repaving of a portion of the existing asphalt parking and some new curb and tree protection. (map)

For questions or comments on this closure, contact Project Manager Aaron Collett at (541) 207-2780.

Posted in Parking Lot Closures.

OSU Campus Alert

Closure or Curtailment of Operations Info

Information regarding closure or curtailment of operations, (including inclement weather or hazardous conditions) with official time of closure will be posted on the University’s OSU Campus Alert website at http://alert.oregonstate.edu.

Recent Posts

  • 11/7/19: Waldo Hall Steam Shutdown 9:00 am- 12:00 pm
  • 11/8/19: Industrial Cold Water Shutdown in Dryden Hall 12:00 pm – 2:00 pm
  • 11/7/19: Street Closure, Jefferson Way between 26th Street and SW Weatherford Place 9:00 am – 12:00 pm
  • 11/6-11/7/19: Pharmacy Air Handler Unit 1 Shutdown, 3 pm-12 am daily
  • 11/2/19: Domestic water shutdown to Large Animal wing and medical gas shutdown to entire building at Magruder Hall, 6:00 am-12:00 pm

Categories

  • Agricultural and Life Sciences Building
  • Air Compressor
  • Air/Ventilation System Shutdown
  • Austin Hall
  • Buildings
  • Burt Hall
  • Cascade Hall
  • Chiller
  • Cordley Hall
  • Crop Science Building
  • Dearborn Hall
  • Dryden Hall
  • Electrical Shutdowns
  • Elevator Shutdowns
  • Fire Alarm System Shutdowns
  • Fire Alarm Testing
  • Generator Testing
  • Gilbert Addition
  • Gilbert Hall
  • Gleeson Hall
  • Johnson Hall
  • Kelley Engineering Center
  • Kerr Administration Building
  • Learning Innovation Center
  • Magruder Hall
  • Milne Computer Center
  • Nash Hall
  • Noise Notices
  • Oak Creek Building
  • Parking Lot Closures
  • Parking Lot Impact
  • Parking Space Closure
  • Pharmacy Building
  • Plageman Student Health Center
  • Restroom Closures
  • Richardson Hall
  • Roadway Delay
  • Sidewalk Closure
  • Snell Hall
  • Steam Shutdown
  • Strand Agriculture Hall
  • Street/Roadway Closures
  • Uncategorized
  • Vacuum System
  • Valley Library
  • Waldo Hall
  • Walkway Closure
  • Water Shutdowns
  • Weniger Hall
  • West Hall

Calendar

June 2019
M T W T F S S
 12
3456789
10111213141516
17181920212223
24252627282930
« May   Jul »

Archives

  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019

Subscribe to a Building List

test
Loading
© 2025 OSU Campus Closures, Shutdowns and Detours, all rights reserved.
Proudly powered by WordPress

Contact Info

Copyright ©2025 Oregon State University
Disclaimer
 

Loading Comments...
 

You must be logged in to post a comment.