We will be performing two unrelated maintenance items during this window.

A) We will be reconfiguring physical links on our lefthand iscsi network (dropping a 8x 1gig lag merging switches in favor of a single 10gig link).

B) Reboot of capacity controller 1 to resolve ssh server bug. All traffic will be handled by controller 2 during the reboot.

Both of these maintenance events should have no impact to customers.

Start: 4/4/2015 21:00

End: 4/4/2015 23:00

If you need help you can contact us during the maintenance at: 7-7SIG (7-7744).

Comments are closed.