The first version of the design was completed 7/15/16. These designs were sent to the fab 7/21/16. The time estimated to arrive back at the lab is about two to three weeks. As soon as the boards arrive we will start the assembly process of all the pieces. Click on the pictures to take you to the github repository.
Wind Vane PBC Design
Reply