Primary Construction activities for the week of 2/25/2019 to 3/1/2019:
Ramp:
Storage Room South Wall- Closing formwork, pouring, and stripping.
Northwest Ramp Radius Wall- Closing formwork, pouring, and stripping.
Southwest Ramp Wall- Setting wall formwork.
Structural Steel:
Stair 2- Install clips, hangers, stairs, and handrails.
East Commons (Z1)- Installing metal decking and closure strips.
West Commons (Z2)- Bolting, plumbing, welding, and installing metal decking and closure strips.
West Lab Wing (Z3)- Bolting, plumbing, and welding
Center Lab Wing (Z4)- Bolting, plumbing, and welding
East Lab Wing (Z5)- Erecting, bolting, plumbing, and welding
Mockup:
-Finish Installing windows
-Installing Backing and Flashing on top of Green Girts
-Installing Soffits