{"id":416,"date":"2019-07-17T18:31:20","date_gmt":"2019-07-17T18:31:20","guid":{"rendered":"http:\/\/blogs.oregonstate.edu\/magruderproject\/?p=416"},"modified":"2019-07-17T18:31:26","modified_gmt":"2019-07-17T18:31:26","slug":"weekly-update-7-15-7-18","status":"publish","type":"post","link":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/07\/17\/weekly-update-7-15-7-18\/","title":{"rendered":"Weekly Update: 7\/15-7\/18"},"content":{"rendered":"\n<p>It&#8217;s a very busy week for the Magruder Hall Expansion, at the clinic the light fixture and electrical trim are being installed and the metal panels will be installed at the connector. The clinic storefront windows will continue to be installed, as well as the casework.  The second floor of the clinic will have the rest of the electrical and plumbing rough-ins going up and then continuing on with sheetrock and wall insulation.<\/p>\n\n\n\n<p>The lecture hall will also be seeing quite a bit of action this week, the casework and lighting fixtures will be installed in the interior of the building. The floors of the lecture hall will be getting a nice polishing this week. On the exterior, the site will be graded and prepped for storm line work. <\/p>\n\n\n\n<p>LINAC is still continuing on with mechanical, electrical and plumbing rough-ins. While the lobby will see framing, utility rough-ins under the concrete slab and sheetrock going up. In the parking lot, concrete will  be poured for curbs and sidewalks. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>It&#8217;s a very busy week for the Magruder Hall Expansion, at the clinic the light fixture and electrical trim are being installed and the metal panels will be installed at the connector. The clinic storefront windows will continue to be installed, as well as the casework. The second floor of the clinic will have the &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/07\/17\/weekly-update-7-15-7-18\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Weekly Update: 7\/15-7\/18&#8221;<\/span><\/a><\/p>\n","protected":false},"author":9198,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-416","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/pa9x0N-6I","jetpack-related-posts":[{"id":391,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/07\/08\/hitting-it-hard-after-the-4th-weekly-update-7-8-7-12\/","url_meta":{"origin":416,"position":0},"title":"Hitting it Hard After the 4th; Weekly Update 7\/8-7\/12","author":"raygr","date":"July 8, 2019","format":false,"excerpt":"After celebrating America's Independence last Thursday, July 4th, crews are ready to get back to work for another busy week! At the clinic, the first floor will see the electrical fixtures go up and the installation of trim will begin. Also, the clinic connector metal panel will be installed at\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2019\/07\/IMG_5182.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2019\/07\/IMG_5182.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2019\/07\/IMG_5182.jpg?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2019\/07\/IMG_5182.jpg?resize=700%2C400 2x, https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2019\/07\/IMG_5182.jpg?resize=1050%2C600 3x, https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2019\/07\/IMG_5182.jpg?resize=1400%2C800 4x"},"classes":[]},{"id":438,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/08\/06\/weekly-update-8-6-8-9\/","url_meta":{"origin":416,"position":1},"title":"Weekly Update: 8\/6-8\/9","author":"raygr","date":"August 6, 2019","format":false,"excerpt":"The lecture hall will have the storm drain going in this week. Inside the lecture hall the flooring will be installed, as well as the vestibule installation. The clinic's activities will be carrying on from last week, the window frames will be installed, with the 2nd floor drywall and overall\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":426,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/07\/29\/weekly-update-7-29-8-2\/","url_meta":{"origin":416,"position":2},"title":"Weekly Update: 7\/29-8\/2","author":"raygr","date":"July 29, 2019","format":false,"excerpt":"Most work from last week at the clinic will be continuing through this week, the storefront windows and glass glazing will be installed and the 2nd floor framing and sheetrock will also continue. New at the clinic this week, the new resilient flooring will start to go in. The lecture\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":423,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/07\/24\/weekly-update-7-22-7-26\/","url_meta":{"origin":416,"position":3},"title":"Weekly Update: 7\/22-7\/26","author":"raygr","date":"July 24, 2019","format":false,"excerpt":"At the Clinic, the metal panels at the connector will be installed. As well as, the windows and those glass glazing throughout the clinic and the cabinetry will also be getting installed this week. The second floor of the clinic will also see sheetrock and framing and the mechanical, electrical\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":369,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/06\/18\/magruder-update-6-18\/","url_meta":{"origin":416,"position":4},"title":"Magruder Update 6\/18","author":"raygr","date":"June 18, 2019","format":false,"excerpt":"Currently at the addition of the clinic, the second floor is having the ducting installed for the heating and cooling system and the clinic overall will start to see paint go up on the walls. The latter half of the week, crews will start to install fixtures and the ceiling\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/06\/IMG_0022.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/06\/IMG_0022.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/06\/IMG_0022.jpg?resize=525%2C300 1.5x"},"classes":[]},{"id":383,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/06\/24\/weekly-update-6-24-6-28\/","url_meta":{"origin":416,"position":5},"title":"Weekly Update 6\/24-6\/28","author":"raygr","date":"June 24, 2019","format":false,"excerpt":"The clinic will be shaping up this week as crews work on installing the metal panels and window frames. The second floor will have additional work going on, as the sheetrock also gets installed this week. The lecture hall will continue to have the installation of the glass glazing, which\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/06\/IMG_4818.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/06\/IMG_4818.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/06\/IMG_4818.jpg?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/06\/IMG_4818.jpg?resize=700%2C400 2x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/06\/IMG_4818.jpg?resize=1050%2C600 3x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/06\/IMG_4818.jpg?resize=1400%2C800 4x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/416","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/users\/9198"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/comments?post=416"}],"version-history":[{"count":2,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/416\/revisions"}],"predecessor-version":[{"id":418,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/416\/revisions\/418"}],"wp:attachment":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/media?parent=416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/categories?post=416"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/tags?post=416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}