{"id":307,"date":"2019-02-18T19:08:03","date_gmt":"2019-02-18T19:08:03","guid":{"rendered":"http:\/\/blogs.oregonstate.edu\/magruderproject\/?p=307"},"modified":"2019-02-18T19:08:03","modified_gmt":"2019-02-18T19:08:03","slug":"a-presidential-weekly-update-2-18-2-22","status":"publish","type":"post","link":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/02\/18\/a-presidential-weekly-update-2-18-2-22\/","title":{"rendered":"A Presidential Weekly Update: 2\/18-2\/22"},"content":{"rendered":"<p>As we kick this week off with Presidents Day, our crew continues to blast through construction, like the blasts that created our founding fathers on Mt. Rushmore.<\/p>\n<p>Once again, the majority of the work this week will be happening at the clinic. The exterior stub walls are still going up and the footings for the entry vestibule (two door system entry) will be started and completed by the end of the week. The second floor will see the framing be finished out and plumbing, mechanical, and electrical rough-ins will be completed but the end of the week.<\/p>\n<p>Weather dependent, both the clinic and lecture hall could be some roofing action starting to take place.<\/p>\n<p>Also at the lecture hall, the exterior stub walls will continue to go up through the beginning of next week. Framing inside the lecture hall will begin early this week and carry through the beginning of March. The piping for the fire suppression system will be closed out by end of day, Wednesday.<\/p>\n<p>The\u00a0slab edge form at LINAC as been pushed over into this week, the concrete pour is now expected to happen next week.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As we kick this week off with Presidents Day, our crew continues to blast through construction, like the blasts that created our founding fathers on Mt. Rushmore. Once again, the majority of the work this week will be happening at the clinic. The exterior stub walls are still going up and the footings for the &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/02\/18\/a-presidential-weekly-update-2-18-2-22\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;A Presidential Weekly Update: 2\/18-2\/22&#8221;<\/span><\/a><\/p>\n","protected":false},"author":9198,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-307","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/pa9x0N-4X","jetpack-related-posts":[{"id":275,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/01\/22\/pushing-through-mlk-jr-day-weekly-update-1-21-1-25\/","url_meta":{"origin":307,"position":0},"title":"Pushing through MLK jr. Day- Weekly Update 1\/21-1\/25","author":"raygr","date":"January 22, 2019","format":false,"excerpt":"As the OSU community enjoyed a extended weekend in celebration of Martin Luther King Jr. Day, Monday the 21st, Fortis and their team were hard at work continuing with the Magruder Expansion. The next several weeks are planned to be very busy over the three site locations and tying in\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":338,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/03\/04\/readjusting-after-snow-weekly-update-3-4-3-8\/","url_meta":{"origin":307,"position":1},"title":"Readjusting after Snow: Weekly Update 3\/4-3\/8","author":"raygr","date":"March 4, 2019","format":false,"excerpt":"After last weeks snow postponed construction for several days, the crew are getting back out there and working hard to get caught up with last weeks schedule. It will be a busy week at the clinic, the exterior stub walls will continue to go up as a continuation from late\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":298,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/02\/11\/starting-to-look-like-a-building-weekly-update-2-11-2-15\/","url_meta":{"origin":307,"position":2},"title":"Starting to look like a building, Weekly Update 2\/11-2\/15","author":"raygr","date":"February 11, 2019","format":false,"excerpt":"If you have been by Magruder Hall, you've seen the major changes taking place with the new expansion. Over the upcoming weeks, this expansion will start taking shape as actually buildings and becoming an integrated foundation to Magruder Hall and the Veterinary College Community. In the terms of major milestones,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=350%2C200 1x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=700%2C400 2x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=1050%2C600 3x"},"classes":[]},{"id":267,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/01\/14\/major-milestones-met-during-1-14-1-18\/","url_meta":{"origin":307,"position":3},"title":"Major Milestones met during 1\/14-1\/18","author":"raygr","date":"January 14, 2019","format":false,"excerpt":"Today, Monday January 14th, 2019 marks some important milestones in the construction of the Magruder Expansion. Starting today, the concrete pour will begin for the clinic's slab on metal deck roof, which is expected to continue into Wednesday. Also, the start of the structural steel for the lecture hall. Installation\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":423,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/07\/24\/weekly-update-7-22-7-26\/","url_meta":{"origin":307,"position":4},"title":"Weekly Update: 7\/22-7\/26","author":"raygr","date":"July 24, 2019","format":false,"excerpt":"At the Clinic, the metal panels at the connector will be installed. As well as, the windows and those glass glazing throughout the clinic and the cabinetry will also be getting installed this week. The second floor of the clinic will also see sheetrock and framing and the mechanical, electrical\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":283,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/01\/29\/weekly-update-1-28-2-1\/","url_meta":{"origin":307,"position":5},"title":"Weekly Update 1\/28-2\/1","author":"raygr","date":"January 29, 2019","format":false,"excerpt":"At the clinic, crews will be prepping for the footings for the vestibule, which is essentially\u00a0an antechamber, hall, or lobby next to the outer door of a building. In which,\u00a0\u00a0a chamber or channel opening into another. Also happening this week at the clinic, you will notice that the exterior framing\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/307","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/users\/9198"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/comments?post=307"}],"version-history":[{"count":1,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/307\/revisions"}],"predecessor-version":[{"id":308,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/307\/revisions\/308"}],"wp:attachment":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/media?parent=307"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/categories?post=307"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/tags?post=307"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}