{"id":275,"date":"2019-01-22T17:53:29","date_gmt":"2019-01-22T17:53:29","guid":{"rendered":"http:\/\/blogs.oregonstate.edu\/magruderproject\/?p=275"},"modified":"2019-01-22T17:53:29","modified_gmt":"2019-01-22T17:53:29","slug":"pushing-through-mlk-jr-day-weekly-update-1-21-1-25","status":"publish","type":"post","link":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/01\/22\/pushing-through-mlk-jr-day-weekly-update-1-21-1-25\/","title":{"rendered":"Pushing through MLK jr. Day- Weekly Update 1\/21-1\/25"},"content":{"rendered":"<p>As the OSU community enjoyed a extended weekend in celebration of Martin Luther King Jr. Day, Monday the 21st, Fortis and their team were hard at work continuing with the Magruder Expansion.<\/p>\n<p>The next several weeks are planned to be very busy over the three site locations and tying in with the existing Magruder Hall.<\/p>\n<p>At the clinic, T. Gerding will be working on the exterior stub walls. While WPI will finish out the exterior framing of the east side of the clinic today and complete the south side framing from Wednesday through Friday.\u00a0 Overlying the entire week, WPI will be installing exterior sheeting which is planned to carry over to next week. Hammerquist plans on finishing up the rain drain piping on the first floor by mid-week and start the rain drain piping on the second floor. Finally at the clinic, Pacific Excavation will begin digging for the vestibule, which is a small room next to the outer door and connecting it with the interior of the building.<\/p>\n<p>Over at the new lecture hall, T. Gerding will be installing the exterior stub walls. Also, Corona will continue with the structural steel installation for the entirety of this week and next. Finally the conduit for the feeders should finish up early this week.<\/p>\n<p>The focus at LINAC during the beginning of the week will be tying up loose ends. T. Gerding will finish placing the slab rebar and working on the slab edge form. Also the plumbing and electrical rough-in should be complete by the end of day on Wednesday. Then the final slab prep for the under overhang will be completed for the concrete slab pour on Friday, the 25th. Please keep an eye for the concrete trucks in the hospital parking lot on this day.<\/p>\n<p>In the existing Magruder Hall, running wires for J-hooks and installing J-hooks will take place over the next week and a half.<\/p>\n<p>Also, make sure to stay up to date with the 4-week schedule outlook and site photos!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As the OSU community enjoyed a extended weekend in celebration of Martin Luther King Jr. Day, Monday the 21st, Fortis and their team were hard at work continuing with the Magruder Expansion. The next several weeks are planned to be very busy over the three site locations and tying in with the existing Magruder Hall. &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/01\/22\/pushing-through-mlk-jr-day-weekly-update-1-21-1-25\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Pushing through MLK jr. Day- Weekly Update 1\/21-1\/25&#8221;<\/span><\/a><\/p>\n","protected":false},"author":9198,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-275","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/pa9x0N-4r","jetpack-related-posts":[{"id":267,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/01\/14\/major-milestones-met-during-1-14-1-18\/","url_meta":{"origin":275,"position":0},"title":"Major Milestones met during 1\/14-1\/18","author":"raygr","date":"January 14, 2019","format":false,"excerpt":"Today, Monday January 14th, 2019 marks some important milestones in the construction of the Magruder Expansion. Starting today, the concrete pour will begin for the clinic's slab on metal deck roof, which is expected to continue into Wednesday. Also, the start of the structural steel for the lecture hall. Installation\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":338,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/03\/04\/readjusting-after-snow-weekly-update-3-4-3-8\/","url_meta":{"origin":275,"position":1},"title":"Readjusting after Snow: Weekly Update 3\/4-3\/8","author":"raygr","date":"March 4, 2019","format":false,"excerpt":"After last weeks snow postponed construction for several days, the crew are getting back out there and working hard to get caught up with last weeks schedule. It will be a busy week at the clinic, the exterior stub walls will continue to go up as a continuation from late\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":298,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/02\/11\/starting-to-look-like-a-building-weekly-update-2-11-2-15\/","url_meta":{"origin":275,"position":2},"title":"Starting to look like a building, Weekly Update 2\/11-2\/15","author":"raygr","date":"February 11, 2019","format":false,"excerpt":"If you have been by Magruder Hall, you've seen the major changes taking place with the new expansion. Over the upcoming weeks, this expansion will start taking shape as actually buildings and becoming an integrated foundation to Magruder Hall and the Veterinary College Community. In the terms of major milestones,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=350%2C200 1x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=700%2C400 2x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=1050%2C600 3x"},"classes":[]},{"id":416,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/07\/17\/weekly-update-7-15-7-18\/","url_meta":{"origin":275,"position":3},"title":"Weekly Update: 7\/15-7\/18","author":"raygr","date":"July 17, 2019","format":false,"excerpt":"It's a very busy week for the Magruder Hall Expansion, at the clinic the light fixture and electrical trim are being installed and the metal panels will be installed at the connector. The clinic storefront windows will continue to be installed, as well as the casework. The second floor of\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":348,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/04\/01\/the-amount-of-work-getting-done-this-week-is-no-joke-weekly-update-4-1-4-5\/","url_meta":{"origin":275,"position":4},"title":"The amount of work getting done this week is NO joke: Weekly Update 4\/1-4\/5","author":"raygr","date":"April 1, 2019","format":false,"excerpt":"This weeks work will take place solely around the lecture hall and the clinic. If you haven't already noticed, the main parking lot of the small animal hospital is now closed and will remain closed through the end of August. For those trying to access the small animal hospital, designated\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/04\/new-parking.png?fit=819%2C547&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/04\/new-parking.png?fit=819%2C547&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/04\/new-parking.png?fit=819%2C547&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/04\/new-parking.png?fit=819%2C547&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":307,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/02\/18\/a-presidential-weekly-update-2-18-2-22\/","url_meta":{"origin":275,"position":5},"title":"A Presidential Weekly Update: 2\/18-2\/22","author":"raygr","date":"February 18, 2019","format":false,"excerpt":"As we kick this week off with Presidents Day, our crew continues to blast through construction, like the blasts that created our founding fathers on Mt. Rushmore. Once again, the majority of the work this week will be happening at the clinic. The exterior stub walls are still going up\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/275","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/users\/9198"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/comments?post=275"}],"version-history":[{"count":1,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/275\/revisions"}],"predecessor-version":[{"id":276,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/275\/revisions\/276"}],"wp:attachment":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/media?parent=275"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/categories?post=275"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/tags?post=275"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}