{"id":267,"date":"2019-01-14T19:01:33","date_gmt":"2019-01-14T19:01:33","guid":{"rendered":"http:\/\/blogs.oregonstate.edu\/magruderproject\/?p=267"},"modified":"2019-01-14T19:01:33","modified_gmt":"2019-01-14T19:01:33","slug":"major-milestones-met-during-1-14-1-18","status":"publish","type":"post","link":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/01\/14\/major-milestones-met-during-1-14-1-18\/","title":{"rendered":"Major Milestones met during 1\/14-1\/18"},"content":{"rendered":"<p>Today, Monday January 14th, 2019 marks some important milestones in the construction of the Magruder Expansion. Starting today, the concrete pour will begin for the clinic&#8217;s slab on metal deck roof, which is expected to continue into Wednesday. Also, the start of the structural steel for the lecture hall. Installation will begin on Wednesday and continue through the end of January.<\/p>\n<p>In other events for the Magruder Expansion- the beginning of the week at the clinic exterior framing for the north side of the building will be completed and moving into exterior framing of the east side of the building which will run through the beginning of next week. It&#8217;s currently expected that the exterior sheeting installation that begins today will carry into at least the beginning of February. Lastly at the clinic, work for the rain drains will be completed midweek.<\/p>\n<p>At the lecture hall, the majority of the focus is centered around beginning the installation of the structural steel. At the end of the week, work will start on installing a new 12&#8243; storm line for the lecture hall.<\/p>\n<p>The site of the LINAC addition will be busy this week, continuing from last week; the LINAC walls will finish out being stripped, by the end of the week the plumbing and electrical concrete rough-ins should be complete, and continuation of working on the slab edge forms.<\/p>\n<p>Working with the existing Magruder Hall, this week they will be tying into the existing water and running new electrical conduit down the hallway by the lecture hall.<\/p>\n<p>Make sure to stay up to date with the current schedule and work site photos!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Today, Monday January 14th, 2019 marks some important milestones in the construction of the Magruder Expansion. Starting today, the concrete pour will begin for the clinic&#8217;s slab on metal deck roof, which is expected to continue into Wednesday. Also, the start of the structural steel for the lecture hall. Installation will begin on Wednesday and &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/01\/14\/major-milestones-met-during-1-14-1-18\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Major Milestones met during 1\/14-1\/18&#8221;<\/span><\/a><\/p>\n","protected":false},"author":9198,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-267","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/pa9x0N-4j","jetpack-related-posts":[{"id":298,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/02\/11\/starting-to-look-like-a-building-weekly-update-2-11-2-15\/","url_meta":{"origin":267,"position":0},"title":"Starting to look like a building, Weekly Update 2\/11-2\/15","author":"raygr","date":"February 11, 2019","format":false,"excerpt":"If you have been by Magruder Hall, you've seen the major changes taking place with the new expansion. Over the upcoming weeks, this expansion will start taking shape as actually buildings and becoming an integrated foundation to Magruder Hall and the Veterinary College Community. In the terms of major milestones,\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=350%2C200 1x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=700%2C400 2x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/02\/lecture-hall.png?resize=1050%2C600 3x"},"classes":[]},{"id":275,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/01\/22\/pushing-through-mlk-jr-day-weekly-update-1-21-1-25\/","url_meta":{"origin":267,"position":1},"title":"Pushing through MLK jr. Day- Weekly Update 1\/21-1\/25","author":"raygr","date":"January 22, 2019","format":false,"excerpt":"As the OSU community enjoyed a extended weekend in celebration of Martin Luther King Jr. Day, Monday the 21st, Fortis and their team were hard at work continuing with the Magruder Expansion. The next several weeks are planned to be very busy over the three site locations and tying in\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":338,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/03\/04\/readjusting-after-snow-weekly-update-3-4-3-8\/","url_meta":{"origin":267,"position":2},"title":"Readjusting after Snow: Weekly Update 3\/4-3\/8","author":"raygr","date":"March 4, 2019","format":false,"excerpt":"After last weeks snow postponed construction for several days, the crew are getting back out there and working hard to get caught up with last weeks schedule. It will be a busy week at the clinic, the exterior stub walls will continue to go up as a continuation from late\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":416,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/07\/17\/weekly-update-7-15-7-18\/","url_meta":{"origin":267,"position":3},"title":"Weekly Update: 7\/15-7\/18","author":"raygr","date":"July 17, 2019","format":false,"excerpt":"It's a very busy week for the Magruder Hall Expansion, at the clinic the light fixture and electrical trim are being installed and the metal panels will be installed at the connector. The clinic storefront windows will continue to be installed, as well as the casework. The second floor of\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":291,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/02\/06\/weekly-update-2-4-2-8\/","url_meta":{"origin":267,"position":4},"title":"Weekly Update 2\/4-2\/8","author":"raygr","date":"February 6, 2019","format":false,"excerpt":"The majority of the site work will take place around the clinic this week. Continuing on from last week, the crews will be prepping for the vestibule footing prep and the interior framing. New this week, the fire suppression system will begin to be installed. The lecture hall framing will\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":359,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/04\/08\/demo-ing-the-lobby-weekly-update-4-8-4-12\/","url_meta":{"origin":267,"position":5},"title":"Demo-ing the Lobby: Weekly update 4\/8-4\/12","author":"raygr","date":"April 8, 2019","format":false,"excerpt":"This week the existing lobby for the animal hospital as well as the small animal hospital parking lot, which closed the beginning of last week. With the parking lot demo, the tree removal will finish up and existing brush will come out too. As the clinic gets incorporated with the\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/267","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/users\/9198"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/comments?post=267"}],"version-history":[{"count":1,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/267\/revisions"}],"predecessor-version":[{"id":268,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/267\/revisions\/268"}],"wp:attachment":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/media?parent=267"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/categories?post=267"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/tags?post=267"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}