{"id":111,"date":"2018-09-24T20:08:33","date_gmt":"2018-09-24T20:08:33","guid":{"rendered":"http:\/\/blogs.oregonstate.edu\/magruderproject\/?p=111"},"modified":"2018-09-24T20:13:15","modified_gmt":"2018-09-24T20:13:15","slug":"concrete-placement-9-24-9-28-updates","status":"publish","type":"post","link":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2018\/09\/24\/concrete-placement-9-24-9-28-updates\/","title":{"rendered":"Concrete Placement: 9\/24-9\/28 Updates"},"content":{"rendered":"<p>Concrete\u00a0for the large clinic will be installed at 4:30 AM this week so to not interfere with the small animal clinic hours. In addition, the acid\u00a0sampling vault will be moved and the communication vault will\u00a0be configured. Mechanical, electrical and plumbing installation underground will begin.<\/p>\n<p>The excavation for the lecture\u00a0hall footings will continue.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Concrete\u00a0for the large clinic will be installed at 4:30 AM this week so to not interfere with the small animal clinic hours. In addition, the acid\u00a0sampling vault will be moved and the communication vault will\u00a0be configured. Mechanical, electrical and plumbing installation underground will begin. The excavation for the lecture\u00a0hall footings will continue.<\/p>\n","protected":false},"author":3122,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-111","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/pa9x0N-1N","jetpack-related-posts":[{"id":423,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/07\/24\/weekly-update-7-22-7-26\/","url_meta":{"origin":111,"position":0},"title":"Weekly Update: 7\/22-7\/26","author":"raygr","date":"July 24, 2019","format":false,"excerpt":"At the Clinic, the metal panels at the connector will be installed. As well as, the windows and those glass glazing throughout the clinic and the cabinetry will also be getting installed this week. The second floor of the clinic will also see sheetrock and framing and the mechanical, electrical\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":167,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2018\/10\/18\/concrete-pour-10-19\/","url_meta":{"origin":111,"position":1},"title":"Concrete Pour 10\/19","author":"raygr","date":"October 18, 2018","format":false,"excerpt":"Starting tomorrow at 4am, Fortis will begin pouring concrete slab for the new clinic. We are expecting to pour about 170sq. yds. of concrete for the new foundation. Please be patient and aware of concrete trucks in and around the hospital parking lot.","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":179,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2018\/10\/29\/big-changes-10-29-through-11-2\/","url_meta":{"origin":111,"position":2},"title":"Big Changes 10\/29 through 11\/2","author":"raygr","date":"October 29, 2018","format":false,"excerpt":"The Clinic\u00a0 On the clinic site, this week the concrete masonry units (CMU) will begin to be installed. CMU blocks are often one of the most versatile materials on site and chosen by many architects and engineers. CMU blocks can provide: Structural Aid Fire Safety Sound Control many other non-construction\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2018\/10\/IMG_3599.png?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2018\/10\/IMG_3599.png?resize=350%2C200 1x, https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2018\/10\/IMG_3599.png?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2018\/10\/IMG_3599.png?resize=700%2C400 2x"},"classes":[]},{"id":369,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/06\/18\/magruder-update-6-18\/","url_meta":{"origin":111,"position":3},"title":"Magruder Update 6\/18","author":"raygr","date":"June 18, 2019","format":false,"excerpt":"Currently at the addition of the clinic, the second floor is having the ducting installed for the heating and cooling system and the clinic overall will start to see paint go up on the walls. The latter half of the week, crews will start to install fixtures and the ceiling\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/06\/IMG_0022.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/06\/IMG_0022.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/osu-wams-blogs-uploads.s3.amazonaws.com\/blogs.dir\/3227\/files\/2019\/06\/IMG_0022.jpg?resize=525%2C300 1.5x"},"classes":[]},{"id":156,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2018\/10\/08\/construction-falling-into-place\/","url_meta":{"origin":111,"position":4},"title":"Construction &#8216;Falling&#8217; into Place","author":"raygr","date":"October 8, 2018","format":false,"excerpt":"On Monday 10\/8 the Fortis crew will begin the concrete pour for the footings at the new lecture hall. Over at the clinic location, work will continue for underground mechanical, electrical and plumbing (i.e. MEP) installation. The clinic will also be having backfill and slab on grade prep, slabs are\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2018\/10\/Capture-3.png?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2018\/10\/Capture-3.png?resize=350%2C200 1x, https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2018\/10\/Capture-3.png?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blogs.oregonstate.edu\/magruderproject\/files\/2018\/10\/Capture-3.png?resize=700%2C400 2x"},"classes":[]},{"id":416,"url":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/2019\/07\/17\/weekly-update-7-15-7-18\/","url_meta":{"origin":111,"position":5},"title":"Weekly Update: 7\/15-7\/18","author":"raygr","date":"July 17, 2019","format":false,"excerpt":"It's a very busy week for the Magruder Hall Expansion, at the clinic the light fixture and electrical trim are being installed and the metal panels will be installed at the connector. The clinic storefront windows will continue to be installed, as well as the casework. The second floor of\u2026","rel":"","context":"Similar post","block_context":{"text":"Similar post","link":""},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/111","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/users\/3122"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/comments?post=111"}],"version-history":[{"count":3,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/111\/revisions"}],"predecessor-version":[{"id":114,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/posts\/111\/revisions\/114"}],"wp:attachment":[{"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/media?parent=111"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/categories?post=111"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.blogs.oregonstate.edu\/magruderproject\/wp-json\/wp\/v2\/tags?post=111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}